New Construction

What We Consider When Planning Electrical Wiring for New Construction

Planning electrical wiring for a new construction, renovation, or addition requires careful consideration of several factors. Proper planning ensures safety, functionality, and future-proofing. Here’s what to consider when mapping out electrical wiring:

  1. Purpose and Use of Each Room:
    The electrical needs of a kitchen, for example, differ vastly from those of a bedroom or home office.
    Consider appliance loads, usage frequency, and special equipment requirements.
  2. Current and Future Power Needs:
    We ensure the electrical system can handle your current needs and any future additions.
    We plan for higher-capacity circuits or room for more circuits in your breaker panel.
  3. Safety:
    We ensure proper grounding for your entire electrical system.
    We will install GFCI (Ground Fault Circuit Interrupter) outlets in areas like bathrooms, kitchens, and outdoors where moisture might be a concern.
  4. Local Codes and Regulations:
    We ensure electrical installations meet local building codes and standards.
    Some areas require inspections post-installation.
  5. Energy Efficiency:
    We always consider energy-efficient systems and fixtures to save on long-term costs.
  6. Type of Wiring System:
    We determine the appropriate wiring system for your needs. Common types include conduit wiring, cleat wiring, and cased wiring.
    The choice often depends on building type, aesthetics, and safety considerations.
  7. Placement of Outlets and Switches:
    We strategically place outlets considering the furniture layout and ease of access.
    Consider adding more outlets than you think you need. This is especially true in spaces like living rooms and offices.
  8. Lighting Design:
    Think about where fixtures will be placed, the types of fixtures, and how they will be switched.
    Consider layered lighting: ambient, task, and accent lighting for versatility in each room.
  9. Future-Proofing:
    With the rise of smart homes and automation, we consider wiring that supports evolving technology.
    Even if you’re not installing smart systems now, we ensure your electrical system can accommodate future upgrades.

The Phases of Wiring

The process of electrical wiring in a new construction or renovation project can be broadly categorized into several key phases. Each phase requires meticulous planning, execution, and oversight to ensure a safe and efficient electrical system. Below are the phases commonly involved in wiring:

1. Design and Planning

Activities:

  • Review architectural plans
  • Draft electrical blueprints
  • Plan locations for outlets, switches, and fixtures
  • Determine circuit routes
  • Obtain necessary permits

Our Considerations:

  • Room functionality
  • Energy efficiency
  • Safety requirements
  • Building codes and regulations

2. Rough-In Phase

Activities:

  • Install electrical conduits or raceways
  • Run wires through walls, ceilings, and floors but leave them unconnected
  • Position outlet, switch, and junction boxes
  • Insert “pull strings” in empty conduits for future wire installation

Our Considerations:

  • Ensure accurate box placements
  • Properly secure conduits
  • Observe safety measures, like de-energizing existing circuits

3. First Inspection

Activities:

  • A local building inspector reviews the rough-in installation.
  • Confirm that the work is up to code
  • Ensure the wires are appropriately color-coded and protected
  • Check grounding and bonding

Our Considerations:

  • No wires should be connected at this point
  • Make any adjustments as recommended by the inspector
  • Obtain a “pass” or an “approval” to proceed to the next phase

4. Installation Phase

Activities:

  • Connect the wires to the outlets, switches, and fixtures
  • Install circuit breakers
  • Set up lighting fixtures and any specialized electrical equipment
  • Make any final adjustments to wire lengths and organization

Our Considerations:

  • Ensure all connections are tight and secure
  • Double-check wiring against the electrical plan
  • Confirm that specialized circuits are appropriately installed

5. Second Inspection and Testing

Activities:

  • Another inspection by local authorities
  • Testing circuits for electrical flow
  • Validate that all fixtures, outlets, and switches are operational
  • Confirm that all safety measures like GFCIs are functional

Our Considerations:

  • Prepare to demonstrate that the system is safe and fully functional
  • Be prepared to make any adjustments as required by the inspector

6. Finish Phase

Activities:

  • Install cover plates on outlets and switches
  • Attach any decorative elements, like lighting trims or custom plate covers
  • Label the circuit breakers clearly
  • Secure any exposed wires or loose ends

Our Considerations:

  • Aesthetic considerations
  • User-friendly labeling for easy maintenance
  • Double-check all safety features

7. Final Walkthrough and Handover

Activities:

  • A final review of the entire electrical installation
  • Handover of all relevant documentation, like blueprints and warranties
  • Provide user instructions, if necessary

Our Considerations:

  • Confirm that all work is done to specification
  • Ensure customer satisfaction

Understanding these phases will help anyone involved in a construction or renovation project appreciate the complexities of electrical wiring, and why it’s essential to get it right the first time.

Let’s Get Started

Continuity is critical in business. Don’t let electrical hitches slow you down. Entrust your commercial electrical troubleshooting needs to The New Alliance Electric Company. Together, we’ll ensure your business runs seamlessly.

For consultations, immediate assistance, or to schedule a service, contact us at 951-563-6232 or use our user-friendly online booking system.

Your business’s power and productivity. Our promise. The New Alliance Electric Company – Electrifying Commerce for a Brighter Tomorrow.